Share

JWG B3/C1/C2.14 Circuit Configuration Optimisation

Circuit configurations of High Voltage Substations are influenced by operational requirements : availability, sectionalizing needs, control and protection scheme...

The objective of the WG is to develop a guideline to support the process of circuit configuration optimisation.